View copies of the following documents presented at the hearings by the Sugarloaf Project Alliance by clicking on the appropriate link below.
| Document Number | Date Submitted | Description |
| 1 | 2/04/2008 | Black Map Folio (includes final blue line preferred corridor and photos of creek crossings)
Issues Posters (PDF, 4.01mb)
Landscape and Visual Appendices (PDF, 15.5mb)
Pipeline Corridor Options - Section A-H (Original PIA Maps) (PDF, 8.06mb)
Public Submission Locations (PDF, 453kb)
Site Location (Original PIA Map) (PDF, 905kb)
Threatened Flora Locations (PDF, 34.2mb)
Photos
Photos of Campaspe River Crossing (PDF, 1.61mb)
Photo - DCP 0278 (JPG, 628kb)
Photo - DCP 3553 (JPG, 708kb)
Photo - Werribee River-Heaths Rd DN600 reinstatement (JPG, 81kb)
Photo - Werribee River-Heaths Rd DN600 reinstatement 2 (JPG, 1.13mb)
Photo - Werribee River-Heaths Rd DN600 welded (JPG, 78kb)
Refined Preferred Corridors
Preferred Corridors A (PDF, 1.66mb)
Preferred Corridors B (PDF, 1.67mb)
Preferred Corridors C (PDF, 1.72mb)
Preferred Corridors D (PDF, 1.71mb)
Preferred Corridors E (PDF, 1.71mb)
Preferred Corridors F (PDF, 1.84mb)
Preferred Corridors G (PDF, 1.92mb)
Preferred Corridors H (PDF, 1.90mb)
Sustainability Maps
Sugarloaf Sustainability Map Section A Final (PDF, 2.76mb)
Sugarloaf Sustainability Map Section B Final (PDF, 3.82mb)
Sugarloaf Sustainability Map Section C Final (PDF, 6.15mb)
Sugarloaf Sustainability Map Section D Final (PDF, 1.75mb)
Sugarloaf Sustainability Map Section E Final (PDF, 1.77mb)
Sugarloaf Sustainability Map Section F Final (PDF, 1.81mb)
Sugarloaf Sustainability Map Section G Final (PDF, 1.77mb)
Sugarloaf Sustainability Map Section H Final (PDF, 1.77mb)
Sustainability Map (PDF, 182kb)
|
| 2 | 2/04/2008 | Outline of Presentation on Behalf of the Sugarloaf Project Alliance (PDF, 45kb) |
| 3 | 2/04/2008 |
Sample Environment Management Plan (PDF, 2.31mb)
Draft Environmental Management Strategy (PDF, 6.41mb)
Example Work Activity Plan (Property 10) (PDF, 742kb)
|
| 5 | 2/04/2008 | Pipeline Construction Methodology – Waterway Crossings (PDF, 1.12mb) |
| 6 | 2/04/2008 | Typical Pipeline Construction (PDF, 250kb)
|
| 7 | 3/04/2008 | Stakeholder Engagement A3 Spreadsheet (PDF, 450kb) |
| 8 | 3/04/2008 | Traffic Management Arrangements for Melba Highway (PDF, 22kb) |
| 9 | 3/04/2008 | Sugarloaf Pipeline Project – Preliminary Investigations: safe & Acceptable Drinking Water (PDF, 316kb) |
| 16 | 9/04/2008 |
Maps of Key Features Requested by Panel
Preferred Corridors A Revision 3 (PDF, 1.69mb)
Preferred Corridors B Revision 3 (PDF, 1.69mb)
Preferred Corridors C Revision 3 (PDF, 1.74mb)
Preferred Corridors D Revision 3 (PDF, 1.73mb)
Preferred Corridors E Revision 3 (PDF, 1.73mb)
Preferred Corridors F Revision 3 (PDF, 1.86mb)
Preferred Corridors G Revision 3 (PDF, 1.94mb)
Preferred Corridors H Revision 3 (PDF, 1.93mb)
|
| 29 | 9/04/2008 | Response to Advisory Committee Questions
Summary of Responses - Socio-economic (PDF, 10kb)
Summary of Responses - Hydrogeology, Hydrology, Geomorphology, Geotechnical (PDF, 20kb)
Responses to 'Key Issues' (PDF, 124kb)
|
| 30 | 9/04/2008 | Community Engagement Record (PDF, 16kb) |
| 31 | 9/04/2008 | Land Access Fact Sheet (PDF, 141kb) |
| 32 | 9/04/2008 | Major Projects Fact Sheet (PDF, 105kb) |
| 33 | 9/04/2008 | Media Engagement Record (PDF, 13kb) |
| 34 | 9/04/2008 | Landowner Engagement Statistics (PDF, 54kb) |
| 53 | 10/04/2008 | Planning memo and maps
Sugarloaf Planning Permit Triggers Memo (PDF, 22kb)
Planning zones 25k mapsheet (PDF, 2.59mb)
Planning overlays 25k mapsheet (PDF, 1.40mb)
|
| 55 | 16/04/2008 | Response to Advisory Committee Terms of Reference (PDF, 174kb) |
| 56 | 16/04/2008 | Package of Correspondence between Alliance and DEHWA
Final DEWHA Response to Submission to AC (PDF, 88kb)
Letter - Comment on Sugarloaf Project Impact Assessment Report (PDF, 55kb)
Comments (PDF, 151kb)
Comment on Sugarloaf Project Draft EMS, Draft EMP and Draft WAP (PDF, 100kb)
|
| 57 | 16/04/2008 | Pump Stations Plans and Landscape Plans
Orig GRPS Photo (PDF, 1.72mb)
Orig SHLPS Photo (PDF, 376kb)
GRPS (ZIP, 1.21mb)
GRPS Landscape (ZIP, 1.03mb)
SHLPS (ZIP, 1.58mb)
SHLPS Landscape (ZIP, 803kb)
|
| 58 | 16/04/2008 | Response to Shire of Yarra Ranges Submission (PDF, 64kb) |
| 59 | 16/04/2008 | Letter from DPCD dated 18 March (PDF, 145kb) |
| 74 | 17/04/2008 | Construction Schedule (PDF, 3.19mb) |
| 75 | 17/04/2008 | Map of Kilometre Points (PDF, 4.05mb) |
| 85 | 17/04/2008 | Closing submission (PDF, 113kb) |
| 86 | 17/04/2008 | Leadbeaters Possum Submission (PDF, 36kb) |
| 87 | 17/04/2008 | Flow regime diagram (PDF, 121kb) |
| 88 | 17/04/2008 | Traffic Impact Assessment memo – GHD (PDF, 567kb) |
| 89 | 17/04/2008 | Dust & Noise memo – GHD (PDF, 1.08mb) |
| 90 | 17/04/2008 | Risk Management Paper (PDF, 262kb) |
| 91 | 17/04/2008 |
Regional Benefits Package report (PDF, 87kb)
|
| 92 | 17/04/2008 | Letter to Oldfields dated 15 April (PDF, 792kb) |
| 93 | 17/04/2008 | Work Method Statement – Devlins Bridge (PDF, 426kb) |
| 94 | 17/04/2008 | Yea Rive Wetlands –Response to Submission (PDF, 389kb) |
| 95 | 17/04/2008 | E-mail from David White – Structure (PDF, 180kb) |
| 96 | 17/04/2008 | E-mail from Jeremy Barber – Soil rehab (PDF, 306kb) |
| 97 | 17/04/2008 | Response to Advisory Committee Key Issue 8 (independent oversight) (PDF, 22kb) |